![]() |
|
The assembly process consists of feeding a base, checking whether it is in the correct position, inserting a bearing, then a shaft and finally a cover. The dismantling process can be performed in the same way.
The troubleshooting simulation system TROUB-200 is included, which generates up to 16 different breakdowns to be diagnosed by the user. Includes the option of integrating a communication interface that allows the user to access the PLC remotely and perform necessary remote maintenance tasks over the Internet. |
| REFERENCES | DESCRIPTION |
|
•SAI1005 |
MAP-205 Assembly minicell (without PLC) |
| •SAI1125 | MAP-205 with Siemens PLC |
| •SAI1225 | MAP-205 with Omron PLC |
| •SAI1325 | MAP-205 with Mitsubishi PLC |
| •SAI1425 | MAP-205 with Allen Bradley PLC |
| •SAI1525 | MAP-205 with Schneider PLC |
|
MAP-205 |
Modules | Sensors (type & qty.) | Input / Output |
|
Base feeder |
Auto-switch, Reed type x15) |
Digital 24/15 |
|
| Other devices (quantity) | Actuators (type & quantity) | ||
|
Breakdown simulation box (x1) |
Pneumatic linear (x6) |
||
** Options: Without PLC, Siemens, Omron, Mitsubishi, Allen Bradley, Schneider. Not included in kit version.